Portfolio

PRODUCT CATEGORIES |  Portfolio
Red Hall Hotel, Bury

Red Hall Hotel, Bury

April, 2009, we fitted out the '39 Bedroom' Hotel with Cornice & mouldings to the customers requirments, overseen by Bethell Construction Ltd in 14 day period

 

 
 
Backford Hall, Cheshire

Backford Hall, Cheshire

October/November 2008, we were asked to reproduce Cornice and mouldings for underside of beam, using only traditional methods and materials on the Cheshire Council Building which is a Listed Grade Building and home for Health & Safety for Cheshire along with Weights & Measures and other departments. along with other reproductive work in the building which included, re fixing birch laths & Lime putty Plastering.

 

 
 
Repair Cornice

Repair Cornice

"Before" After startng the work for Norwich Union Ins, we found dry rot, after this was replaced and treated, we returned with newly moulded sections of cornice to re-fit the whole bay window area.

 

 
 
more..

more..

before, Typical electrical rewire situation, where the cornice was damaged to a room in over 15 areas, we were called in do the repair,

 

 
 
Column archway

Column archway

please click on "details" for larger photo.

 

 
 
more..

more..

before, Typical water damage to lounge ceiling after a bathroom flood , where the cornice was damaged to the corner in the room, this was infact a paper embossed design we used fillers only to repair,

 

 
 
more..

more..

before, Typical water damage to bay window area in lounge caused by bad weather , the cornice was damaged in the whole bay, we traced the Cornice shape and run a section came back later to fit.

 

 
 
more Match up

more Match up

before, The whole front elevation of the house was rebuilt leaving the bay window area in lounge missing cornice, we took a silicon cast from site and reproduced several lenghts came back later to fit.

 

 
 
Lighting effects

Lighting effects

please click on "details" for larger photo.

 

 
 
PRODUCT CATEGORIES |  Portfolio